411 Maple Child’s Dresser Pt.3

February 11, 20100 Comments

It’s only been a couple of weeks since the last post on the construction of the recent Child’s Dresser. As we move on with today’s episode, we continue working on the four legs. Taking the rough blanks and dimensioning them to their finished sizes and then cutting in grooves for the side panels and eventually the mortises that will accept the tenons for the drawer rails in the front.

Download Video File

Filed in: ProjectsVideos
Tagged with:

Leave a Reply

Back to Top